Community
Inspiration
Innovation
Service
Vision
 
7350 E Speedway Blvd.
Suite 210
Tucson, Arizona 85710

(520) 326-3700

THE REFINERY AT THE BRIDGES

Ed Marley
Project Principal
Project Architect

Kevin Barber
Project Manager

The Refinery is the first building development at the University of Arizona Tech Parks at the Bridges development. The four story building consists of 30,000 floor plates with expansive use of glazing to maximize natural light and views. The exterior materials pallet consists of burnished face CMU veneer, aluminum composite panels, linear metal panels and glazed curtain wall.

Sustainability features include high performance glazing, insulated wall panels high quantities of recycled material content LED lighting low water use landscape, and low flow plumbing fixture. Various departments from the University of Arizona will occupy 60,000 sf of the building.

  • HIGHLIGHTS
  • 120,000 SF Building
  • $16.5 Million
  • On Schedule
  • 4 story building with 30,000 SF per floor
  • Hi-tech aesthetic through the use of curtain wall and three types of metal panel systems
  • LEED Silver goal

Left Arrow Back | Next Project Right Arrow