THE REFINERY AT THE BRIDGES
Ed Marley
Project Principal
Project Architect
Kevin Barber
Project Manager
The Refinery is the first building development at the University of Arizona Tech Parks at the Bridges development. 120,000 GSF office building with 4 floors at 30,000 SF each. Exterior materials palette consists of burnished face CMU veneer, aluminum composite panels, linear metal panels and glazed curtainwall. Sustainability features include high performance glazing, insulated wall panels, high quantities of recycled material content, LED lighting, 4 electric car charging stations, low water use landscape, and low flow plumbing fixtures.
- HIGHLIGHTS
- 120,000 SF Building
- $15.6 Million
- Completed 2021
- 4 story building with 30,000 SF per floor
- Hi-tech aesthetic through the use of curtain wall and three types of metal panel systems
- LEED Silver goal
- Abundant glazing provides natural light and views